"About 120 protesters outside Mullingar station Ming Flanagan, Maura Harrington, etc. Supporting McCabe. M" - Ex-Garda Commissioner Callinan
"You can judge a man by his friends" Brian Purcell - SG of Dept of Justice
"Some shower Brian" Callinan
Corrib Gas Refinery/Terminal: 9 Fundamental Objections – June ‘05
1. Pipeline under gasfield pressure 150-345 BAR travelling 9km inland in close proximity (50-100m) to many homes is unprecedented anywhere. An umbilical conduit carrying supply lines for electricity and methanol (11oC flashpoint) would lie in the same trench.
3. 49,500 barrels of highly inflammable substances to be stored on site were precluded from objection at the terminal Planning stage. Methanol, highly toxic and highly explosive, would be comprise more than half of this and waste condensate/oil to be incinerated on site would account for the remainder. Health & Safety Authority responsibility is confined to within the terminal area despite the compound risk posed to residents by the extremely dangerous ‘gasfield-pressure’ pipeline on this site.
4. The project requires installation of enormous refrigeration/pressure facility seven or so years down the line which will involve storage of huge additional quantities of highly inflammable gas (propane). Again no account of the potential dangers of this is permitted at the current planning stage, despite a specific requirement in EU Environmental Impact Assessment legislation for its inclusion.
5. Likewise, EU Environmental Impact Assessment requirements re investigation of alternative sites (and technology) were blatantly evaded by the developer at all stages of the application, despite specific Section 10 referral back by ABP for specificly such investigations to be made.
6. The Planning Authority (Mayo C.C.) failed to commission an independent technical evaluation of the previous application. The implications of this failure were acknowledged by the Planning Officer at the Oral Hearing under rigorous questioning by the Inspector. The so-called fast-tracking initiative by the government has resulted in this failure being repeated.
7. Because the proposed terminal/refinery site straddles a ridge separating two watersheds should there be a major disaster (e.g. Whiddy Island) the Carrowmore Lake SAC/SPA 2km.to the south, which supplies the N.W. Mayo region, would be seriously polluted by outflow from fire fighting efforts etc., as would the magnificent Sruwaddacon SAC/SPA estuary c.1km to the north.
8. Both the gasfield pipeline and the export pipeline (to Craughwell in Co. Galway) would travel very considerable distances through bogland, which the contractors (Arup Engineering) acknowledge as the most difficult type of terrain due to its instability. Recent landslides at Pollatomish would undeniably have ruptured the gasfield pipeline (150 BAR pressure) had the original route not been objected to and consequently changed. The potential for instability in bog is by no means confined to landslides – bog bursts on almost imperceptible slopes are a fact of life in blanket bogland.
9. Condensate, a waste oil separated from the gas, is to be incinerated on-site despite the unlimited and free supplies of comparatively clean gas. Conveniently this entails the need for an IPPC licence from EPA which, in turn, pre-empts objections until a later post-planning stage. This illustrates the prevalent strategy of project splitting and facilitates incineration of pollution waste on site.